piling rig for guardrail
Home

Solar foundation ramming unit

Solar foundation ramming unit

  • How Many Piling Machines Does a Large Solar Farm Need? Fleet Size, Pile Height and the Machine Mix
    Nov 24, 2026
    One piling machine drives about 50 piles in an hour and about 400 in a normal 8-hour day, and a utility-scale site asks a different question: how many machines, and which mix. Anhui TeZhong Machinery Technology Co., Ltd. builds the range that has to turn those figures into a row-by-row programme — from the 4.0 m TZ585 to the 8.0 m TZ8000, with a listed monthly capacity of 500 machines. Those hourly and daily numbers are factory baselines, not site measurements: no soil type, pile length, pile diameter or operator skill is attached to them. Our solar foundation ramming unit line covers both crawler and wheeled chassis, so a fleet can be matched to the ground rather than forced into one format. As a direct manufacturer and OEM supplier in Suzhou, Anhui, we would rather work the arithmetic in the open. Quick Answer: what a large site actually needs A single rig is rated at about 50 piles per hour, or roughly 400 in an 8-hour day, so a 4,000-pile block is 10 machine-days of baseline output — one machine for ten days, two for five, or five for two. That is arithmetic on a factory figure, not a measured schedule. The machine range covers 4.0 m to 8.0 m piles at 52 kW to 91 kW, with the TZ536 and TZ8000 listed at 105 L fuel tanks and a 30-working-day lead time on the TZ536. Anhui TeZhong Machinery Technology Co., Ltd. builds the chassis, the mast and the control package, and a fleet is specified as a list of machines, not a single model name. Figure 1: Fleet output is the sum of individual machines. The mix depends on pile height, ground and how far the crew has to move. 50 / hour Factory baseline, one rig 400 / 8 h Same baseline, one shift 4.0–8.0 m Pile height across models 500 / month Listed production capacity Table of Contents What does a utility-scale site demand from a piling fleet? How many machines does a given pile count call for? Which pile heights should one fleet cover? Why mix crawler and wheeled machines on the same site? What changes when a row runs into rock? How many operators does a fleet of machines need? Can a factory actually deliver the whole fleet on time? What belongs on an RFQ for more than one machine? FAQ What does a utility-scale site demand from a piling fleet? A large PV block is a repetition problem. Thousands of posts go into the same row pattern, and the machine that is fastest on paper is useless if it cannot hold position, reach the pile height on the drawing, or move to the next block before the crew is ready. Three things set the fleet: the number of posts in the programme, the height and diameter on the drawing, and the ground between the rows. We ask for those three before we talk engines. A fleet is a list of machines with different jobs — a tall-reach unit for the long piles, a lighter one for the short rows, and a rock-capable unit where the ground changes — not several copies of one model ordered because it worked on the last site. How many machines does a given pile count call for? Start with the factory baseline of about 50 piles an hour, or 400 in an 8-hour day, then divide the block into machine-days. The table below is arithmetic on that baseline — 50 × 8 = 400 — not a measured output for any named project. It gives you a starting number to argue with, which is better than a promised completion date. Piles in the block Machine-days at 400/day One possible split 400 1 1 machine for 1 day 4,000 10 2 machines for 5 days, or 5 for 2 40,000 100 10 machines for 10 days Every row assumes a full 8-hour day, no breakdowns, no relocation and ground that behaves the same in the last row as in the first. None of that is guaranteed. Add a second machine before you compress the schedule, and treat the result as a planning figure until your own first rows confirm it. Which pile heights should one fleet cover? The standard range runs from 4.0 m on the TZ585 to 8.0 m on the TZ8000, with 4.5 m on the TZ630, 5.5 m on the TZ536 and TZ680, and 6.0 m on the TZ670. Power follows reach: the TZ585 is rated 52 kW, the TZ630 75 kW, and the 5.5 m and 8.0 m machines 91 kW at the top of their ranges. A fleet for mixed drawings usually pairs a mid-reach machine with one long-reach unit rather than buying every height. Hole depth is a separate limit from driving height. The TZ536 drives 5.5 m piles and opens 5.0 m holes at 50–400 mm, while the TZ8000 handles 8.0 m piles and 7.5 m holes. The TZ536 and TZ8000 both carry 105 L fuel tanks; the TZ680 carries 120 L. Tell us the drawing, not just the pile length you remember. Why mix crawler and wheeled machines on the same site? Crawlers hold position on soft or uneven ground; wheeled units move between blocks faster. Our wheeled TZ680 is listed as cutting transfer time by up to 40%, which matters when a site is split into widely spaced arrays and the machines are moving more than they are driving. One chassis cannot optimise both. The TZ650 crawler adds a different reason to mix: GPS, automatic levelling and a control system that lets one operator complete the piling task. It is sold into both PV and road work. A highway barrier post piling unit follows the same logic of repeatable spacing and plumb posts, so the platform earns its keep in both programmes rather than sitting idle between them. What changes when a row runs into rock? Driving a post straight into hard rock wastes attempts, wears the machine and leaves piles bent or off-line. Where the ground turns, the hole is opened first: compressed air powers the hammer and blows out the cuttings while the drill rod rotates — impact and rotation together. That is the point at which a fleet needs a rock-capable unit rather than another driving hammer. Depth and diameter are separate ceilings there too. Our pneumatic DTH hammer unit line runs to 30 m, 35 m and 50 m with 90–500 mm holes and 10–50 m³/min air demand. For PV rows that only need to cross a shallow rock band, pre-drilling on the alignment is usually enough; for deep sockets, the work belongs to a dedicated rig with an air supply sized to the hammer. How many operators does a fleet of machines need? On the TZ650, one person can complete the piling task: the tablet handles parameters and status, and the remote handles the rest. Custom remote-control packages on shipped units work at about 100 m, and the TZ539 supports all operations from the remote at roughly that distance. One operator is not one site. Setting out, pile supply, refuelling, checking the first holes and moving between blocks still need a crew, and someone has to decide what to do when the ground changes. We do not quote posts per shift from a headcount alone — the ground decides that number. Where automation helps is consistency: the same sequence, the same plumb check, repeated across thousands of posts. Can a factory actually deliver the whole fleet on time? Listed capacity is 500 machines a month, and the published lead time is 30 working days on the TZ536 and 7 working days on the TZ390. Those are catalogue terms for standard configurations; a custom mast, engine or remote package changes the schedule, and the date belongs on the signed sheet. A customer in Saudi Arabia ordered ten TZ536 units, and another in Laos ordered five — batch orders are built to the same configuration sheet as a single machine. CE and ISO9001 certification, a test run on the yard and video outgoing-inspection are what we can show before shipment. Machine warranty runs one year, electrical parts three months, with wear parts excluded; payment is by T/T or 100% L/C at sight. We quote the same terms to a wholesale distributor as to an end user, and we will not promise a delivery date for a specification that has not been fixed. What belongs on an RFQ for more than one machine? Five items, and the first one is the count. As an OEM factory we can change engines, masts, hammer heads and control packages, but only after the scope is written down: Item on the RFQ What it fixes Post count and programme window How many machines, from the 400-per-day baseline Pile heights and diameters on the drawing 4.0 / 4.5 / 5.5 / 6.0 / 8.0 m and 50–400 mm Ground profile, including rock bands Driving hammer, auger or pre-drilling package Crawler, wheeled or a mix Ground holding versus up-to-40% faster transfers Emission standard, remote and guidance options 52–91 kW engines, ~100 m remote, GNSS package Send those and our engineers will answer with a machine list, the specification table for each model and a written configuration sheet. Ask for the functions by name — remote range, GNSS base station, levelling package — rather than by a marketing word. FAQ How many piles does one machine cover in a day? About 50 per hour and about 400 in a normal 8-hour day. That is the factory baseline we quote, with no soil type, pile length or operator attached to it. Multiply it to size a fleet, then confirm it against your own first rows. Which machine handles the tallest piles? The TZ8000, at 8.0 m pile driving height and 7.5 m drilling depth on a 91 kW rating. The range also covers 4.0 m, 4.5 m, 5.5 m and 6.0 m machines, so most large sites pair a mid-reach unit with one long-reach machine. How long is the lead time on a batch order? Published lead time is 30 working days for the TZ536 and 7 working days for the TZ390, with listed capacity of 500 machines a month. Custom engines, masts or remote packages change that date, so the agreed schedule belongs on the signed configuration sheet.
    Read More

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Our hours

Whether it is a holiday or a festival, we will have someone to receive you 24 hours a day and respond to you in the shortest time.

Contact Us: jennifer@tzpilemachine.com

home

products

WhatsApp

CONTACT US

Need Help? Chat with us

Start a Conversation

Hi! Click one of our members below to chat on