For Solar PV Ground Mounting | Piling | Pulling | Drilling | Screw pile driving | Auger drilling
Pile Driving Height: 4.0m
Screw Piling Driving Height: 4.0m
Drilling Depth: 4.0m
Drilling Diameter: 50~400mm
Rated Power: 75/91 KW
Product Number :
TZ539Order(MOQ) :
1Power Type :
DieselWeight :
6000 0kgLead Time :
30 Workimg DaysProduct Origin :
1Shipping Port :
Shanghai , Qingdao Port etcWarranty :
1 YearVideo outgoing-inspection :
ProvidedSpecification:
| Item | Unit | Value |
| Piling height | mm | 4000 |
| Screw pile driving height | mm | 4000 |
| Drilling depth | mm | 4000 |
| Drilling diameter | mm | 50-400 |
| Auger drilling diameter | mm | 50-500 |
| Work dimensions (L ×W × H) | mm | 3900×1900×5500 |
| Transport dimensions (L×W× H) | mm | 4950×1900×2600 |
| Operating weight | Kg | 6000 |
| Track assembly specifications (L×W×H) | mm | 2829×2150×672 |
| Track plate width | mm | 300 |
| Track ground clearance | mm | 230 |
| Track drive ratio | / | 1 :21.4 |
| Climbing ability | % | <58 |
| Working platform turning angle | ° | 360 |
| Rated power | KW | 91 |
| Hydraulic oil pump | Triple -pump | 50+50+32 |
| Hydraulic system pressure | bar | 200 |
| Hydraulic system flow | l/min | 115 |
| Max.torque of walking motor | Nm | 7700 |
| Walking speed | Km/h | 0-3 |
| Max. torque of hydraulic motor | Nm | 12000 |
| Hydraulic motor flow | l/min | 0-160 |
| Drilling angle (right and left) | ° | 15 |
| Drilling angle (anterior and backward ) | ° | 0-115 |
| Hydraulic oil tank capacity | L | ~105 |
| Fuel tank capacity | L | ~85 |
CLIENT FEEDBACK
By choosing TeZhong , you will not only get world-class equipment, but you will also be able to further increase your profitability, welcome to join us.

Production Process
The production process of Guardrail pile driver involves the following steps:

FAQ
Q1: Are you a manufacturer?
A: Yes, we are a professional down the hole drill rig and top hammer drill rig manufacturer.
Q2: What does your company produce?
A: The company's main products include highway piling and drilling machines, photovoltaic piling and drilling machines, and a variety of air compressors for moving work trucks.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, it depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C.
Q5: Do you offer any deals or discounts?
A: Yes, price depends on different quantity, different quantity will give you different price.
Our hours
Whether it is a holiday or a festival, we will have someone to receive you 24 hours a day and respond to you in the shortest time.
Hi! Click one of our members below to chat on